Labour cost calculator for building and trade quotes.
Labour is where a clean quote often wins or loses.
Check labour days, crew size, day rates, subcontractor cost, contingency, and margin before the quote leaves your business.

Price the labour properly
Check crew size, days, day rate, contingency, and markup before quoting labour.
Inputs
Example: two tradesmen for eight days, plus subcontractor allowance and labour margin.
Instant result
Raw labour cost
£4,560
2 people x 8 days
Cost with risk
£5,733
£273 contingency
Labour quote price
£6,880
Labour profit
£1,147
Want the working file?
Enter your email, then download the CSV. The result stays visible above.
Crew size matters
Two people for three days is not the same as one person for six days once supervision, access, and sequencing are considered.
Protect against slippage
Weather, waiting time, client delays, and rework need a visible allowance on risky jobs.
Compare estimate to actuals
QuoteBuild keeps estimated labour attached to live job tracking so overruns show before completion.
What to do before you send the price.
Step 1
Enter trade, crew count, days, and rate.
Step 2
Add subcontractor, supervision, and contingency allowances.
Step 3
Review labour margin before sending the quote.
Free download
Send me the builder quote template.
You will get the spreadsheet template and calculator. If you want the quote-to-profit workflow, start the trial after.
Quick answers.
How do I price labour for a quote?
Start with realistic days and crew count, then add supervision, travel, risk, overhead, and profit.
Can I track labour separately from materials?
Yes. QuoteBuild separates labour and materials so margin is easier to understand.